Auto-Generated Summary
> Provide an extensive
summary of the agreements by topic. No need to mention CRs.
Extensive Summary of Agreements by Topic:
HARQ Multiplexing on PUSCH
- If UCI multiplexing of different priorities is not
enabled, the restriction on scheduling PDSCH after UL grant is removed for
PUSCH with repetitions (except the first repetition).
- UE generates Type-1 HARQ-ACK codebook according to the
existing specification with modifications for setting the actual
‘ACK/NACK’ value corresponding to PDSCH(s) scheduled after the UL grant.
- UE generates Type-2/3 HARQ-ACK codebook according to the
existing specification.
- RRC parameters are introduced to configure the function of
scheduling PDSCH after a UL DCI format and multiplexing associated HARQ on
PUSCH repetitions (except the first repetition).
- The number of PUSCH repetitions can be
scheduled/configured by gNB.
- Additional UE capabilities are introduced for HARQ-ACK
codebook size change and PUCCH resource change on a PUCCH slot.
Pathloss RS for Type 1 CG-PUSCH
- Agreement on Rel-18 TEI proposal for pathloss RS for Type
1 CG-PUSCH.
- Relevant TP for clause 7.1.1 in TS 38.213 is endorsed in
principle.
- UE behavior for PUSCH transmission configured by
ConfiguredGrantConfig is defined, including RS resource index
determination based on provided parameters.
Multi-DCI Based Multi-TRP Operation
- Agreement to support QCL-TypeD prioritization rules for
overlapping CORESETs performed per coresetPoolIndex value.
- Procedures for PDCCH monitoring in overlapping CORESETs
are defined, including prioritization rules for CSS and USS sets.
- Introduction of a UE capability for the red part of the
text describing these procedures.
1-Symbol PRS
- Agreement to send a reply LS to RAN2 regarding 1-symbol
PRS.
- Changes to DL PRS configuration for RTT-based Propagation
Delay Compensation are needed.
- RAN1 proposes a note for the numSymbols field description
to clarify UE expectations for PRS configuration.
Complexity Reduction Solutions for FR2
- Proposal for complexity reduction solutions for FR2
Spreadtrum Communications was discussed but not further considered in the
meeting.
UE Capability with Up to 6-Layer DL MIMO
- No consensus reached.
As per RAN1 chair’s guidance, no further discussion is expected in Rel-18.
PUSCH Repetition Type A
- No consensus reached.
As per RAN1 chair’s guidance, no further discussion is expected in Rel-18.
Enhanced PDCCH Reception for mDCI Based mTRP
- Agreement reached for multi-DCI based multi-TRP operation
with defined procedures for overlapping CORESETs.
Longer CG-SDT Periodicities
- Draft reply LS on longer CG-SDT periodicities was endorsed
and approved.
Other Proposals
- No consensus reached for TEI proposals on enhancement for
scheduling requests and further complexity reductions for FR2 RedCap.
This summary captures the key agreements across various
topics discussed in the document.